Cities and developments across North Dakota require dependable infrastructure to support housing, energy operations, and expanding municipal needs. Projects often face tight deadlines, strict environmental regulations, and remote site challenges, which makes having the right partner critical.
Romtec Utilities is unique positioned to meet these demands. We specialize in designing, manufacturing, and supplying fully integrated wastewater lift stations that are code-compliant, engineered for long-term performance, and delivered on schedule.
In the heart of North Dakota's energy region, the City of Williston has experienced rapid population growth due to the expansion of natural gas and oil operations. To support this influx of workers and their families, infrastructure had to evolve just as quickly. One such development was the Pleasant Valley RV Park, a large-scale residential project designed to accommodate hundreds of RVs and mobile homes. At the core of this development was a critical need: a high-capacity wastewater lift station. That's where Romtec Utilities stepped in.
Overview
BIP 40, LLC, in collaboration with engineering firm DJ & A, P.C., developed a 114-acre RV park to house employees working in nearby natural gas facilities.
The site included:
To support this large-scale development, a wastewater lift station capable of handling over 1.2 million gallons per day was required. Romtec Utilities was selected to design, manufacture, supply, and start up the system.
Key system features include:
Challenge: Meeting Deadlines and Standards
The Williston RV park project faced serious infrastructure demands, and a tight timeline. The project needed wastewater capabilities in under four months to stay on track. Additionally, the system had to be robust enough to handle high daily volumes of wastewater while being scalable for future growth.
Working with North Dakota's regulatory framework, all plans had to be reviewed and approved by GEOMAP Company. That meant no delays and no shortcuts.
Solution: Romtec's Fast-Track Process
Romtec Utilities delivered a package lift station that met all the engineering, regulatory, and operational requirements. Romtec's integrated approach, from design and manufacturing to on-site startup, ensured the project stayed on schedule without compromising quality or performance.
The solution in full included:
Thanks to our in-house engineering and manufacturing capabilities, we kept the project moving from concept to completion, all in less than four months.
Why Romtec was chosen
BIP 40 and its engineers chose Romtec Utilities for several reasons:
North Dakota communities need partners that understand urgency, compliance, and long-term system performance. Romtec delivers on all three.
Here are a few other examples of projects completed by Romtec Utilities in the Midwest:
Clean Water Industrial Pumping in Groton, South Dakota
Wastewater Lift Station at Middle School in Sullivan, Illinois
Industrial Process Water Pump Station in Fridley, Minnesota
At Romtec Utilities, we don’t just build pump stations we build partnerships.
Our team of mechanical, electrical, and structural engineers works closely with clients to design systems that are:
Whether you're dealing with stormwater, wastewater, or industrial water systems, Romtec Utilities offers turnkey services that include everything from initial design to final installation.
Contact Romtec Utilities today to learn how we can support your next pump station project with expert design, manufacturing, and installation services.