Modern Infrastructure for a Growing Connecticut
Connecticut is investing in the future by upgrading aging infrastructure and supporting new development across the state. At Romtec Utilities we specialize in pump systems that meet the demands of expanding communities and revitalized urban centers.
Whether you're planning a septic-to-sewer conversion, managing stormwater in flood-prone areas, or supporting new housing developments, our turnkey solutions deliver:
- Complete engineering and documentation
- Prefabricated systems for fast deployment
- Compliance with Connecticut's standards
- Support for municipal, commercial, and residential projects
From Hartford to New Haven, Romtec Utilities is ready to help Connecticut build smarter, safer, and more sustainable water infrastructure.
SPOTLIGHT PROJECT

Lift Station in Kimberly, Idaho
As residential and mixed-use development accelerates across Connecticut, municipalities are facing increased demand for modern, reliable, wastewater infrastructure. A recent Romtec Utilities project in Kimberly, Idaho, highlights how turnkey lift station solutions can support rapid growth while meeting regulatory and operational standards - even in areas without established infrastructure design protocols.
Overview
The Olsen Farms Lift Station was designed for a new 127-lot subdivision in Kimberly, Idaho. The project was a collaboration between the developer 3 Emeralds, Romtec Utilities, and the City of Kimberly. Because the city lacked formal lift station standards, Romtec modeled the system on existing infrastructure and worked closely with municipal and consulting engineers to deliver a complete, compliant solution.
Key system features include:
- Duplex submersible Sulzer pumps
- 113 GPM capacity
- 6-ft diameter, 16.66-ft deep wet well
- Micrologix 1400 PLC controller
- Pressure transducer and redundant float sensors
- Full commissioning, startup and operator trainer
Why this matters to Connecticut
Connecticut is currently prioritizing infrastructure modernization and supporting smart growth in cities and towns across the state. Connecticut communities may be dealing with:
- Rapid residential and commercial development
- Outdated or inconsistent utility standards
- Limited staff time for engineering and procurement
- Tight project timeliness and compliance requirements

Other Projects:
Here are a few other examples of projects completed by Romtec Utilities in the Northeast:
Courthouse Lift Station Project in Mineola, New York
Power Plant Pumping System for Exelon West Medway, Massachusetts
Residential Development Wastewater Lift Station in Township of Lakewood, New Jersey

Why Choose Romtec Utilities?
At Romtec Utilities, we don’t just build pump stations we build partnerships.
Our team of mechanical, electrical, and structural engineers works closely with clients to design systems that are:
- Custom-fit to each site’s requirements
- Built with high-quality components
- Installed with precision and care
- Supported with long-term reliability
Whether you're dealing with stormwater, wastewater, or industrial water systems, Romtec Utilities offers turnkey services that include everything from initial design to final installation.
Ready to get started?
Contact Romtec Utilities today to learn how we can support your next pump station project with expert design, manufacturing, and installation services.
